Consultancy services for preparation of Detailed project report (DPR) for Widening and Strengthening /Reconstruction of Existing Pavement to Two Lane/Two Lane with Paved Shoulder including Replacement of Culverts and Bridges of stretch from Godda (on NH-133)-Ramgarh-Guhiyajori-Dumka(on NH-114A) in the state of Jharkhand.

Consultancy Services for Feasibility Study and Preparation of Detailed Project Report for SH-105 (BETTIAH-NARKATIYAGANJ-BHIKHANATHORI ROAD) 

Consultancy Services for preparation of Detailed Project Report for Strengthening and Widening/Reconstruction of existing pavement to 2 lane /2 lane with Paved Shoulder including replacement of Culverts and Bridges of Simar-Boarijore-Borio-Tinpahar-Rajmahal road in the state of Jharkhand.

Consultancy Services for preparation of Detailed Project Report for Strengthening and Widening / Reconstruction of Bero (NH-23)-Bhandra-Lohardaga (NH-143) Road to be upgraded into Four/Two lane with paved shoulder including replacement of culverts and bridges.

Consultancy services for Preparation of Detailed Project report for Strengthening and Widening / Reconstructiom of NH 98 to be upgraded into Four / Two lane with paved shoulder including replacement of culverts and bridges.

Development of NH-147 ( old NH-8C ) including 6-lanning with service road on either side from km 16+350 to 31+300 ( package –II ) in the state of Gujarat on EPC basis “National Highway Division, Roads & Building Department, Government of Gujarat

Consultancy Services for preparation of Feasibility Study and DPR for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC mode in the state of Arunachal Pradesh under SARDP-NE Phase ‘B”.

Consultancy services for preparation of Detailed Project Report for Widening and Strengthening / Re-construction of existing pavement to Four Lane with paved shoulder including replacement of culverts and bridges from Km 266.348 to Km 283.000inMahbubnagar-Jadcherla road of NH-167 in the State of Telangana

Preparation of Detailed Project Report (DPR) for Widening and Strengthening / Reconstruction of existing Pavement to Two Lane/Two Lane with Paved Shoulder including Replacement of culvert and Bridges of Stretch from Peterwar (on NH-23)- Tenughat-Gomia-Narki-Budgadda-Penk-Dumri (on NH-2) in the State of Jharkhand.

Consultancy Services for preparation Detailed Project Report for Strengthening and Widening / Reconstruction of NH333A (Godda-Panjawada) Road to be upgraded into Four/Two lane including replacement of culverts and bridges.

Consultancy services for preparation of Detailed project report for widening and Strengthening /Re construction of stretches from Katoria (Bihar)at NH-333A Chanan-Deogarh (Jharkhand)  to be upgraded into Four/Two lane with paved shoulder including replacement of culverts and bridges.

Consultancy services for preparation of Detailed Project Report for Widening and Strengthening / Re-construction of existing pavement to Two Lane with PS/Four Lane including replacement of culverts and bridges in Hatgamaharia-Balandia-Majhiaon-Benisagar road up to junction with NH 49 near Singada in the State of Jharkhand.

Detailed Design Consultancy services for ―Rehabilitation and Upgrading to 2/4 – Lane with Paved Shoulders Configuration and Strengthening of Nepal Border (at Kakarvita) to Bangladesh Border (at Banglabandha) comprising of Kakarbitta Panitanki – Bagdodara- Shivmandir more -Naukaghat- Fulbari – Banglabandha section of AH 02 corridor in the state of West Bengal (“The Works”) on EPC mode‖

Preparation of Detailed project Report (DPR) for Widening and strengthening/Reconstruction  of Existing Pavement to Two lane with Paved Shoulder including Replacement of Culverts and Bridges, Land Acquisition Plan, Resettlement and Rehabilitation Plan & Forest Diversion Proposal of stretch for Bagodar-Barmasia-Manikadih-Kowar-Pachamba Road in the State of Jharkhand-Tentative Length-70Km. under ADB-II projects4

“Construction of two-Lane with hard shoulders of Chakabama – Zunheboto Road on EPC basis from existing Km 0.000 to Km 25.760 [Design Km. 0+000 to Km. 25+000] (Design Length –25.000 Km) in the state of Nagaland under SARDP-NE Phase A. NATIONAL HIGHWAYS & INFRASTRUCTURE DEVELOPMENT CORPORATION LTD. (Ministry of Road, Transport & Highways) Government of India